Varisco Wellpoint - Manutenzione diga in quota

High altitude dam maintenance

Maintenance operation of the basin drainage channel at 2000 metres.

Two self-priming motor pumps on a raft were used for the application. The machines and equipment were transported at height and, given the significant altitude, a crucial consulting activity was carried out to plan the work.

Read more...